Skip To Content

Weld County Parkway 

Weld County Parkway opened to the public on November 10, 2015.

DSCN1295


With the aid of a $3.1 million grant from the Colorado Department of Local Affairs (DOLA), Weld County built a four-lane concrete road and two new bridges without incurring any debt.

This 3.5-mile road extends WCR 49 north from U.S. 34 to WCR 60.5 tying into WCR 47 at the first county-owned traffic signal. The Parkway, along the WCR 49 Corridor, provides a vital north-south road through the county.

The project was rated the Best Portland Cement Concrete County Road Project in 2015 from the Colorado/Wyoming Chapter of the American Concrete Paving Association (ACPA). The award recognizes high-quality workmanship and serves as an opportunity to share information about highly-successful projects. Click here to read the press release.

Weld County Public Works also developed a master drainage study for the area around the Parkway and WCR 49 Corridor north of WCR 50 with the help of Farnsworth Group, an engineering consultant selected from among four companies that responded to a request for proposals. The study can be downloaded with the links on this page (large document). Please email comments or questions to Senior Engineer Mike Bedell, P.E., at mbedell@weldgov.com or call (970) 400-3706.

Vicinity Map4 - No Holly

 

DSCN1291c

 

Logo

Contact Information

Public Works Department

Don Dunker, P.E.
County Engineer

Email: ddunker@weldgov.com
Phone: (970) 304-6496 x 3749


Mike Bedell, P.E.
Senior Engineer

Email: mbedell@weldgov.com
Phone: (970) 400-3706


Public Works Department

1111 H Street, Greeley

Phone: (970) 400-3750
Fax: (970) 304-6497

Mailing address:
P.O. Box 758
Greeley, CO 80632


SOCIAL