Freedom Parkway Access Control Plan

Photo of Freedom Parkway


We’re Almost There! – Last Chance to Review and Comment

The two-year process to develop the Freedom Parkway Access Control Plan (ACP) is almost complete.  Input from residents, business owners, staff, and elected officials received through October 15, 2018, has been incorporated into the final ACP report.   The links below contain the final report, which is scheduled for adoption by the participating jurisdictions along the corridor between October 16 and mid-December 2018.

report coverMembers of the public are invited to attend the adoption events and provide any final comments as desired.  Check the upcoming agendas of your Town Board or City Council for more information.  Weld County will adopt the Freedom Parkway ACP after all other jurisdictions have done so.  The public is likewise welcome to attend the Weld County meetings:

  • Planning Commission - November 20, 2018 at 12:30 PM
  • Board of County Commissioners – December 12, 2018 at 9:00 AM

Both meetings will be held in the Weld County Administration Building at 1150 “O” Street, Greeley.  If you have any questions or comments, please send them to Everett Bacon at ebacon@weldgov.com.

Click on the drop-down menus to download the report, individual chapters, appendices, and newsletters:


Full Report and Chapters

Full Report (PDF, 6.5 MB)

Table of Contents (PDF, 0.1 MB)

Chapter I - Introductions (PDF, 0.7 MB)

Chapter II - Existing Conditions (PDF, 2.3 MB)

Chapter III - Access (PDF, 0.6 MB)

Chapter IV - Public Involvement (PDF, 0.7 MB)

Chapter V - Access Recommendations (PDF, 0.2 MB)

Chapter VI - Policies (PDF, 1.0 MB)

Chapter VII - Referrals and ACP Amendments (PDF, 0.1 MB)

Appendices

Appendix A – Study Area (PDF, 0.1 MB)

Appendix B – Corridor Vision Ultimate Cross-section (PDF, 0.4 MB)

Appendix C – Growth Management Areas (PDF, 1.6 MB)

Appendix D – Rivers, Trails, and Parks (PDF, 1.1 MB)

Appendix E – Access Inventory Maps (PDF, 45 MB)

Appendix F – Access Photo Inventory (PDF, 0.1 MB)

Appendix G – Potential Future Traffic Signals & Roundabouts (PDF, 12.9 MB)

Appendix H – Speed Limits (PDF, 2.8 MB)

Appendix I – Greeley-Evans Transit Route 2 (PDF, 0.1 MB)

Appendix J – Access Inventory Database and Recommendations (PDF, 0.2 MB)

Appendix K – Intergovernmental Agreement (PDF, 0.1 MB)

June 2018 Public Meetings – Thank You!

The Freedom Parkway Coalition hosted two public photo of public meetingmeetings in June 2018 for the public to review and comment on the draft Access Control Plan. Several comments were provided and incorporated into the plan. Topics of interest to the public included roundabouts (for and against), new traffic signal locations, shoulder widths, speeding, and truck traffic. The Coalition is very appreciative of the thoughtful comments made by members of the public who have contributed their valuable time in helping develop the Access Control Plan.

    Presentation for Public Meetings (PDF, 2.4 MB)

Freedom Parkway Access Control Plan – What’s it all about?

Corridor Study Area

The corridor includes all or portions of SH-402, Larimer County Road (LCR) 18, Weld County Road (WCR) 54, and 37th Street. It is approximately 25 miles long, starting at LCR 7 near the Loveland – Johnstown boundary on the west to WCR 49 near Kersey on the east.

graphic study area

Purpose

Roads generally serve two purposes – 1) mobility for people and freight and 2) access to adjoining properties. The purpose of the Freedom Parkway Access Control Plan (ACP) is to maintain and enhance safety and mobility while also providing reasonable access to adjoining properties as growth and development occur over time. Safety is the main reason for managing access on the corridor.

ProcessProcess Flowchart

The Freedom Parkway Coalition was responsible for guiding the study and establishing final recommendations based on the technical analysis and public input. The Coalition was made up of both elected officials and technical staff. The elected officials comprised the policy group that approved the plan’s recommendations. Staff made up the Technical Advisory Committee (TAC), who reviewed and analyzed data and input to make recommendations to the policy group.

graphic corridor vision

Corridor Vision

The first major step in preparing the ACP was a visioning process to establish a target framework for the analysis and subsequent policies. The Freedom Parkway Coalition envisioned the corridor as a regional, multimodal, urbanized transportation link between Loveland and Kersey. Specifically, the Coalition established an ultimate cross-section for the corridor as a 4-lane, divided, limited access urban arterial.

The cross-section does not establish a design standard for the corridor. Rather, it serves as a framework for local governments to consider as future roadway improvements occur. The ACP recognizes that each jurisdiction may have an arterial street standard that differs to some degree from the corridor vision ultimate cross-section.

Click on the cross-section graphic for a larger version.

Goals of the Access Control Plan

  • Improving safety along the corridor
  • Coordinating development, improvements, access, design standards, and other issues among jurisdictions
  • Promoting economic vitality along the corridor
  • Protecting investments in infrastructure
  • Maintaining the functional integrity of the corridor by reducing traffic conflicts and improving traffic flow

Access Control Strategies

The following access control techniques are applied to existing locations to refine and ultimately reduce the number of access points on Freedom Parkway as future development occurs:

  • Elimination – Access points may be removed at unsafe locations, where there are more than two existing access points for a parcel, or where spacing requirements are not met.
  • Relocation – Access points may be relocated to meet spacing requirements or align with other access points. This could include moving access from Freedom Parkway to an intersecting side street.
  • Consolidation / Shared Access – Access points in close proximity may be consolidated into a single location and/or shared between adjoining developments. This often requires cooperation between neighboring property owners.
  • Movement Conversion / Reconfiguration – Allowable vehicular movements at some existing access points may be reduced to meet safety and mobility objectives. One example might be a location with full access into and out of a driveway that is reduced to a right-in, right-out configuration.

   graphic access consolidation

Access Types

Access type refers to the land use on the adjoining property that the access serves. The colored arrow symbols are used on the access inventory maps presented later in this chapter. They are defined as follows:

  • Agricultural/Field/Ditch Access –These support farm and ranch operations and are generally used seasonally during planting and harvesting seasons.
  • Residential Access - These are typically driveways to residences and multifamily developments.
  • Commercial Access - These access locations serve businesses, schools, government buildings, and utilities such as electric substations.
  • Oil & Gas/Industrial Access - Oil and gas facilities, including wells, tanks, valve sites, etc., and industrial buildings are served by this access type.
  • Multiple Use Access - Shared access occur where two properties or uses utilize the same access.
  • Future Access - Existing parcels with no frontage on a side road and no existing access on Freedom Parkway are considered landlocked and will be allowed access in the future as appropriate and consistent with the ACP. This access type also includes locations that have been previously approved but not yet constructed.

Policies

Several policies were established by the Freedom Parkway Coalition to aid in the implementation of roadway improvements and access management as development occurs on the corridor in the future. Click here for more information on any of the following policies: 

  • New Access                 graphic utility depths
  • Access with Safety Concerns
  • Change of Use
  • Road Spacing
  • Access Permanency
  • Right-of-Way
  • Speed Limits
  • Weight Limits / Truck Routes
  • Functional Classification
  • Road Cut & Boring
  • Level of Service
  • Full Intersection Control / Traffic Signals & Roundabouts

  

 graphic Freedom Parkway logo

Freedom Parkway Digital Updates

News will be delivered right to your cell phone or email box. Sign up here.

Notify Public Works

Online Comment and Concern Form

CONTACT INFORMATION

Elizabeth Relford
Deputy Director

Email: erelford@weldgov.com
Phone: (970) 400-3748


Public Works Department

1111 H Street, Greeley
Phone: (970) 400-3750
Fax: (970) 304-6497

Mailing address:
P.O. Box 758
Greeley, CO 80632


Board of County Commissioners 10/8/18 presentation (PDF, 6.2 MB)

Access Inventory Maps with jurisdiction boundaries (PDF, 28.4 MB)